Hwy 86 Sewer Ph 1

Image
23:45pm- Sign will be removed first thing tonight for road crossing work.  00:09am- Light plant is now up and running! 02:16am- Roadway is now almost cut and transit is aligned to MH A-03 from MH A-02.  03:37am- 1st joint placed finally! Heading across Devils Pool Rd now.  05:41am- Halfway across road. Clean fill gravel going in now to switch over traffic.  06:47am- Directing of traffic going well.  07:28am- Another look at traffic. 08:38am- Both lanes now passable as we are into fire station area now.  09:20am- 112’ of pipe laid this morning. Crew will continue with backfill gravel to get further away from roadway. 

Hwy 86 Sewer Ph 1

Image
07:46am- Crew has switched jobs this morning. They are currently getting road ready for asphalt patching off Jones Rd.  09:22am- Crew back doing rebar for slope anchors… 10:02pm- Slope anchors in now awaiting concrete.  12:55pm- Concrete going in now.  14:55pm- Pipe now connected to MH A-02.  Line is also lamped by laser.  -Had issue on 86 Hwy Job I had to go address… 16:45pm- Ditch over line coming up hill is almost filled up now on Tower Rd.  17:28pm- Work was going to continue tonight to do the road crossing, but excavator has gone down. 

Hwy 86 Sewer Ph 1

Image
06:57am- Crew to begin gravity portion today at MH A-01 location.  09:31am- Crew has finally begun digging at MH A-02 at top of gravel road to begin laying pipe downstream today.  12:11pm- Base of MH A-02 is set, but laser wouldn’t go past -15% slope.  Now digging from existing MH 02 in edge of road uphill to MH A-02 at a grade of 15.97%.  13:06pm- Crew is now laying pipe with everything in line now.  14:45pm- 112’ of gravity line now in place! 15:52pm- A look from the top down.  17:44pm- Cree now calling it a day. 16’ left to go to MH A-02. 

Hey 86 Sewer Ph 1

Image
07:59am- Crew is digging under power and other utilities this morning to get force main a bit closer to bore. This is mostly hand digging.  09:39am- Slow process this morning… 11:21am- Still digging under utilities… 12:45pm- Pipes now going in.  13:33pm- Making sure of positive grade. This is the last joint to be placed here today. 60’ total.  13:48pm- Area for tie now dug out! Crew will finish the day marking out and cutting path through fire station concrete.  14:30pm to 16:15pm - Meeting at new LS site at Arena.  17:16pm- Clearing for MH A2 and down to LS occurring. This will round out the day. 

Hwy 86 Sewer Ph 1

Image
07:08am- Crew is back to locate electrical supply this morning and see what clearance we will have if any… 07:38am- Water line for fire station is found, electric for island sign and still looking for main power crossing.  08:38am- North end of bore now exposed. Survey to shoot flow line today on each end.  09:46am- Thrust block is poured at STA 60+25 approximately.  Ditch is getting dug back to end of pipe from utilities located earlier.  10:44am- 1st joint now tying back into line for the day headed towards fire hydrant location.  11:24am- 60’ of pipe now in.  11:56am- 80’ now placed with gravel and ditch tape.  12:46pm- 100’ of pipe is now in. Backfill will continue.  14:06pm- Backfill completed! 14:09pm- Two more joints to be added to bore.  14:34pm- A total of 140’ is now loaded into casing! 15:23pm- Spoils have been moved to allow traffic from middle of drive.  15:30pm- Sweeping is now also completed across asphalt areas! Crew is c...