07:01am- Crew pumping water from manhole at AWWOB for temporary run of pipe to the overflow side of the basin this morning.
07:56am- Pipe is to basin now! Dirt to be placed over it to hold in place.
Rock breaking occurring on force main this morning.
13:55pm- FlatCreek finally begins preparing to lay pipe this afternoon across the new emergency exit road from the Arena.
14:15pm- Digging begins!
15:10pm- Transit is getting set up for shooting creek depth vs. ditch depth.
15:34pm- 1st joint in place.
15:58pm- Pipe is across roadway. Gravel to continue.
16:45pm- oversized rock is going in atop nedded pipe now i. The roadway!
17:15pm- Cleanup to occur before they leave tonight to get roadway back open.