Hwy 86 Sewer Ph 1


07:01am- Crew pumping water from manhole at AWWOB for temporary run of pipe to the overflow side of the basin this morning. 

07:56am- Pipe is to basin now! Dirt to be placed over it to hold in place. 

Rock breaking occurring on force main this morning. 

13:55pm- FlatCreek finally begins preparing to lay pipe this afternoon across the new emergency exit road from the Arena. 

14:15pm- Digging begins!

15:10pm- Transit is getting set up for shooting creek depth vs. ditch depth. 

15:34pm- 1st joint in place. 

15:58pm- Pipe is across roadway. Gravel to continue. 

16:45pm- oversized rock is going in atop nedded pipe now i. The roadway!

17:15pm- Cleanup to occur before they leave tonight to get roadway back open. 