07:14am- Crwws will ne working today to begin digging here at Arena LS site and to finsh setting ARV’s. 
07:39am- D26 ARV now set at STA 45+81. 

08:00am- Structure at STA 26+42 to be set along with ARV. 

08:34am- Structure now placed. 

08:59am- Gravel being placed now around pipe. 

09:13am- D26 ARV now set. 

09:29am- Work at Arena LS site. A couple more trees had to come out on the lower SW corner. 
09:48am- Water going in force main now at STA 62+00. 

10:37am- Gravel going in over exposed utilities. 

11:59am- Cleanup work around fire hydrant area here ar Branson Cedars is underway!

12:53pm- D25 ARV installed at STA 41+32. 

13:55pm- Defining edge so large rocks can be placed back in a row again. Water continues to be pumped into the force main as well!

14:08pm- Gravel will now be placed around lateral line going to the back corner of the fire station. 
14:23pm- Lateral line now graveled!

15:36pm- Force Main is now full of water! It will set tonight and hopefully test tomorrow. 

15:52pm- Work continues today at Arena L.S., excavator has gone to get jack hammer from truck at top of the hill. 

16:42pm- Jack Hammer is available now for when rock is encountered. The good soil being dug out is being hauled out of site to parking lot for storage so that it can be used again later for backfill. 



17:13pm- End of day here at LS site. All the dirt the excavator is sitting on, out towards entrance to site will be dug on out!


Area where rock definitely needs broke out.

This is footing grade here in SW corner. 