Hwy 86 Sewer Ph 1
06:56am- Crew sweeping in road cut on Devils Pool this morning as equipment is leaving site.
07:50am- Moving structures this morning to their appropriate locations along force main.
08:22am- ARV structure now set at STA 41+32.
09:03am- Prepping subgrade to except structure at STA 45+31.
09:38am- ARV structure now set!
10:34am- Dirt is being pulled atop of the line path so that dozer can make easy work of leveling out spoils.

10:46am- Pipe and spacer's are delivered today to allow for finishing up bore and getting force main tied in.

12:39pm- Paving on old Shooting Academy Rd is now finished. Patch work turned out nicely!
Seen Marty w/Big Cedar and he was happy with it.
13:25pm- Road patch on Devils Pool Rd is now underway.
13:49pm- Half of Devils Pool now patched.
14:30pm- Devils Pool now finished with patch work!
15:01pm- Some cleanup around cabin taking place so that we are out of the way for some work that will be starting on it.

16:23pm- Crew cutting RCP for valve vault at STA 54+23.
17:00pm- RCP now cut as excavator carries rock box out in background. This will round out the day here!